Correcting MEP design with BIM models: lessons from Marina Da Nang
When source drawings need adjustment mid-project, BIM lets you trace the impact of every change across all systems - lessons from a complex project.
When drawings need correction, a BIM model provides a clear reference for assessing the impact of each change.
Trace changes by system.
An architectural or structural change can affect several technical routes. The design team needs to review the connected areas before issuing updated drawings.
Working directly in the model lets disciplines discuss the same spatial context.
Record decisions for the next coordination cycle.
Each decision needs an owner and an update status. This helps the team control open items through later correction rounds.