All insights

BIM

BIM documentation: construction drawings produced directly from the model

When drawings are extracted from the model instead of redrawn, mismatch between documents and site drops significantly. Learn the BIM issue workflow.

5 min read

Documents produced from a model need a review process so issued information stays aligned with the design intent.

Use the model as the information source.

When plans, sections and schedules are extracted from one model, the team has a clear source of reference. Changes need to be made at that source before documents are issued again.

This reduces repeated editing across separate files.

Review before issue.

Checking drawing names, displayed scope and technical interfaces makes documents easier to follow. A consistent issue process also helps every party use the right version.

START A PROJECT

HAVE A PROJECT IN MIND?LET'S ENGINEER IT BETTER.

Share your project brief — the NNI team will respond with a tailored solution and proposal.